The decking is completed and the Alsynite goes up to provide the rain
protection over the western doors and windows.
With much of the indoor construction work complete, it’s time to give everything a good clean out. The carpets that were originally in the house were laid upside down over the new polished concrete months ago and each piece was dragged outside, given a good bash with lots of sweeping and vacuuming inside before reinstating the carpets.
All done with the back doors firmly closed to avoid dusting the newly stained deck.