For a few months now, the entrance to the cellar has been covered with the same steel that
provides the ceiling for the cellar with a ladder on top which was the only way
up. While there were no safety issues, other than falling off a ladder, it was not
an easy way of viewing what was happening on the first floor.
It’s a trade-off though between having stairs in place for easy access
against having them trashed due to heavy use during building. With stairs in place, things have changed greatly.
The gas heaters are fixed in place with the facia’s still safely in
their boxes.
The baths have arrived and will be installed once the bathroom walls have
been fully siliconed.
The painter has started with paint going on the
veranda timber while it's accessible prior to the tin being installed and the bathroom windows get a coating.
Off site, we order a new door knocker for 19 to match the one on 17. No problem, visit Adelaide Restoration Centre on Magill Road and order one that matches pretty well.
Get out the wire brush to clean the original one and it breaks in half, the break indicated that it may have been cracked for quite a while. So another is ordered, they will definitely match now.