Saturday, July 15, 2017

Week Thirty-eight – Some of the finer points

Building a house gets a bit frustrating the further you get into it. Many of the big changes have been done and while there are plenty big items left, the kitchens, bathroom fittings etc., there a many smaller items that need to happen that can take a fair bit of time.

Things like the routing of the front veranda. While there’s plenty of maintenance free steel out the back, getting the right heritage look out the front requires dome detailing.




Inside some work is done getting the timber floors ready for polishing in 19 and a new floating floor for 17. The carpet grippers need to be removed and there’s a number of staples that the floor sanders won’t enjoy.