The formwork comes out of the cellar and you get a fair idea of just
how big it’s going to be. Steel decking will sit on top of this and the slab
will be poured to form a strong lid.
Most of the footings are dug and it’s a tight place to work with a few
of the trenches needing to be dug by hand. Having a big obstacle in the middle
doesn’t help. There’s a fair pile of dirt that needs to go before the final
trenching is done ready for the plumber, electrician and the concreters.
Off
site, the solar system is ordered and more options are sought for
air-conditioning.