Not much happening, trades need to be scheduled and one can slow
everything down.
Every building site in Adelaide want their slab poured before Christmas
and we’re not alone.
The walls of the cellar get a bit of a clean-up and some more plumbing
goes in before the formwork is done with more plumbing and electrics to be set
in place before the cement is poured.
And as is normal, when things get quiet, far too much time is wasted on
Sketchup.