To split the current single title into 2 separate Torrens titles the
building needs to fire separation compliance with the Performance Requirements
of the Building Code of Australia. Simply put, we need a fire rated party wall.
The timber framing for it went up last week with the ceiling joists needing to
be cut and separated, propped into place with the insulation, fibre cement
panels and finished with the Soudal expanding filler.
The box gutters are an integral part of the new roof and have to be measured in place, built and installed before the lid goes on. The bracing is done for the
gutters to sit on, meanwhile the Rondo supports are started in readiness for
the ceilings.
Rain is forecast for Sunday and it’s a long weekend so the tarps go up.
We need to work out what the final product will look like so play with
colour splashing a bit on the front of the house, it looks like Solver’s Stone
White will be the colour for most surfaces with the doors probably black to
match the window’s timber.